Blog

It’s week 5 of my (Amy Girard) kitchen addition project and this week the rough-ins begin. The Schloegel team also built our

Read More

On our latest podcast Donna Kirsopp, CKBR joined us to discuss how she designs outdoor spaces. Donna has designed many amazing outdoor

Read More

It’s week 4 of my (Amy Girard) kitchen addition project and this week it’s time to start demolition but I’m also going

Read More

Our clients had found their forever home in a lovely Leawood neighborhood, and after living there for 7 years they were ready

Read More

I was afforded the opportunity to build my tiling skills with some large format tile work that included a shower niche. Under

Read More

It’s week 3 of my (Amy Girard) kitchen addition project and this week I’m sharing how we prepped for our remodel including

Read More

It’s week 5 of my (Amy Girard) kitchen addition project and this week the rough-ins begin. The Schloegel team also built our custom range hood, and the insulation went in. Our project leads Ryan Waters & Joe Meagher worked through several pain points during these steps and laid the ground work for an amazing kitchen.

Read More

On our latest podcast Donna Kirsopp, CKBR joined us to discuss how she designs outdoor spaces. Donna has designed many amazing outdoor spaces through her years and shares great insight! Does it seem to be a more common request than it used to be? We’re getting a lot more of that. I think people are

Read More

It’s week 4 of my (Amy Girard) kitchen addition project and this week it’s time to start demolition but I’m also going to share framing and roofing. In actuality, it’s a four-and-a-half-month remodel and we are currently at the tail end of it. Many of these steps definitely took longer than a week but at

Read More

Our clients had found their forever home in a lovely Leawood neighborhood, and after living there for 7 years they were ready to give the space their own signature. They wanted an aesthetic update throughout the main floor and some significant changes to their kitchen and dining room. They reached out to Schloegel and worked

Read More

I was afforded the opportunity to build my tiling skills with some large format tile work that included a shower niche. Under the patient instruction of our Thomas Schauffler, I learned about planning layout, cutting and leveling large pieces.  This hallway bathroom had seen some wear, and the blue on the walls was a bit loud.

Read More

It’s week 3 of my (Amy Girard) kitchen addition project and this week I’m sharing how we prepped for our remodel including setting up a temporary kitchen. Missed how it began, check out Week 1 and the design in Week 2. Before hammers start swinging at your project Schloegel holds a Pre-Construction meeting. My remodeling team

Read More